visit ncsu.edu

Vista @ NC State

Server Status

Vista Server Maintenance - past semesters

Summer 2008 Server Maintenance Windows
date maintenance summary
06/07/2008 not used
07/19/2008 not used
08/02/2008 not used
08/16/2008 Made config changes on primary db and san. Replaced failed switch.
Spring 2008 Server Maintenance Windows
date maintenance summary
01/19/2008 Not Used
02/02/2008 Not Used
02/16/2008 Not Used
03/01/2008 Not Used
03/15/2008 Fix Un-assignment stuck issue (Call 482802)
04/05/2008 Not Used
04/19/2008 Installed SP3 (Blackboard Vista 4.2.3)
05/11/2008 – 05/14/2008 Not Used
Fall 2007 Server Maintenance Windows
date maintenance summary
9/15/2007 6am - 10am : Updated Vista to version 4.2.1
10/6/2007 Not Used
10/20/2007 Not Used
11/3/2007 6am - 10am : Updated Vista to version 4.2.2
11/17/2007 6am - 11:30am : Made changes to JMS settings
12/1/2007 Not Used
12/21/2007 11am to 4:30pm : Updated firmware on load balancers (No interruption to service)
Summer 2007 Server Maintenance Windows
date maintenance summary
6/2/2007 12:00am - 5:30am: Moved database datafiles off of old 3510 disk array to SAN
6/16/2007 08:00am - 11:00am: Removed old 3510 and 3310 from V880
7/7/2007 06:00am - 09:00am Edited browserchecker.xml and restarted cluster.
7/21/2007 06:00am - 10:00pm Upgraded from 4.03 to 4.12 (App pack 1 Service Pack 2)
8/4/2007 06:00am - 9:30am Upgraded from 4.1.2.1 to 4.2.0.1 (Application Pack 2, Hotfix 1)
Spring 2007 Server Maintenance Windows
date maintenance summary
1/6/2007 Maintenance window was not used.
1/20/2007 6:06am - 2:35pm: Restarted and made cold backup of the production cluster.
2/3/2007 6:00am - 2:18pm: Upgraded database hardware, made cold backup of the production cluster.
2/17/2007 6:00am - 1:11pm: Patched O/S on all clusters.
3/3/2007 6:00am - 3:00pm: Applied daylight saving time patches.
3/17/2007 6:00am - 3:00pm: Checked SSL certs and rebooted cluster
4/21/2007 6:00am - 3:00pm: Installed new network hardware, updated Horizon Wimba powerlink, adjusted application and database configurations.
5/12/2007 11:30pm - 12:00am:Restarted database and application nodes to initialize new configuration.
5/14 - 5/17/2007 Maintenance wndow was not used.
5/15/2007 9:00pm - 7:00am: Cold copy of database
Fall 2006 Server Maintenance Windows
date maintenance summary
9/3/2006 Maintenance window was not used.
9/17/2006 6:00am-11:20am: Applied Oracle patches and made a cold backup of the production database.
10/1/2006 6:00am-7:56am: Applied fix for Banner Integration and restarted production cluster.
10/15/2006 6:00am-10:15am: Applied additional fixes for Banner Integration and restarted production cluster.
11/5/2006 10:00am-3:00pm: Made a cold backup of the production cluster.
11/19/2006 6:00am-9:30am: Applied Hotfix 61590 and completed additional database maintenance.
12/3/2006 6:00am-12:40pm: Made a cold backup of the production cluster and completed additional maintenance.
12/28/2006 - 12/31/2006 Maintenance window was not used.
Summer 2006 Server Maintenance Windows
date maintenance summary
5/14/2006 - 5/17/2006

We migrated successfully from WebCT Vista 3 to WebCT Vista 4. This is an entirely new version of the product and contains many new features and enhancements.

MCNC staff installed Solaris operating system 10.

MCNC staff implemented switch and other networking hardware changes.

MCNC staff along with WebCT Premium Support worked with us on resolving networking and software configuration issues.

5/21/2006 Maintenance window was not used.
6/4/2006 7:00am-10:00am: We successfully added two additional application nodes (we now have three total) to our load balanced cluster in addition to adding new SSL certificates and restarting the primary application node.
6/18/2006 6:00am-3:00pm: We successfully restarted our application servers in order to implement configuration changes and run tests.
7/2/2006 Maintenance window was not used.
7/16/2006 6:00am-12:30pm: We successfully restarted our application servers, implemented a fix for migrated course issues, and completed other maintenance work.
8/6/2006 6:00am-12:30pm: We successfully upgrade to WebCT Vista 4.0 Service Pack 3 and performed a full file system backup of the database.
Spring 2006 Server Maintenance Windows
date maintenance summary
1/15/06 6am-3pm: We successfully installed Load Balancing for WebCT Vista with 2 application nodes (2 additional nodes planned).
2/5/06 7am-8:30am: We restarted all servers.
2/19/06 Maintenance window was not used.
3/5/06 6am-10:30am: We successfully created a full backup image to use for testing the Vista 3 to 4 migration. MCNC successfully added a new switch.
3/19/06 Maintenance window was not used.
4/2/06 9:30am-4:30pm: MCNC successfully completed networking and switch maintenance.
Fall 2005 Server Maintenance Windows
date maintenance summary
9/4/05 6am-9:30am: We successfully installed the Wimba Powerlink for WebCT Vista and restarted the primary application node.
9/18/05

6am-3pm: We installed Vista 3 Service Pack 5. This service pack includes BEA Weblogic updates, Vista application updates, Java updates, and changes to some database tuning parameters. We also installed hotfixes 52080 and 52090.

MCNC staff installed Solaris operating system patches, updated firmware on the database and application nodes, audited Solaris security settings, and rearranged/installed hardware within our racks.

10/6/05 - 10/9/05 Maintenance window was not used.
10/16/05 Maintenance window was not used.
11/6/05 6am-8:30am: We successfully installed Oracle Database updates.
11/20/05 Maintenance window was not used.
12/4/05 Maintenance window was not used.
12/15/05 - 12/18/05

We installed Vista 3 Service Pack6. This service pack includes BEA Weblogic updates, more browsers added to the supported list, and various product enhancements.

MCNC staff installed Solaris operating system patches which were recommended as well as security patches.

MCNC staff along with WebCT Premium Support worked with us on configuring the load balancers for deployment in the near future.

© 2008 NC State University
Disclaimer